Alternate Energy Research and Innovation Lab (AERIL)

Projects



Third Party Validation of the project “Reconciliation of electricity billing using AMI meters in Punjab (Pilot Phase)”

[Completed]

AERIL-KICS provided third party validation consultancy services in order to assess and validate the objectives of project conducted by Reconciliation Cell department of Energy Department Punjab.…

Read More




Consultancy Services for project “Solarization of Off-Grid and Other Schools in Punjab”

[Completed]

Government of Punjab initiated the solar system installation for 4321 remote off-Grid Government schools all over Punjab to improve the electricity provision situations at schools. AERIL-KICS,…

Read More




FATA Grants Pre and Post Visits/ Validation of Drinking Water Supply Schemes, Irrigation Tube Wells and Solarization systems

[On-going]

Consultancy services are being provided by AERIL-KICS for Solar PV energy supply schemes for Offices , Community centers , Hospitals, Schools, drinking water supply schemes…

Read More




Consultancy and Validation Services for Promotion and Vetting of LED Lights Installation as Energy Conservation Approach

[Completed]

PEECA required the consultancy services to promote the LED lights as future energy saving retrofit for public and private sector. In this project, about 5MW energy saving potential was intended targeting commercial and industrial sector. The…

Read More




Energy Audit of 20 Public Sector Institutes in Punjab including Universities, Hospitals, Medical Colleges

[Completed]

AERIL KICS-UET Lahore has provided consultancy services to PEECA to conduct detailed energy audits of the Punjab origin Public sector institutes. The scope of work included university campuses, medical colleges and…

Read More




Feasibility Study for solarization of new water pumps in Bannu.

[Completed]

Updated soon...

Read More




Feasibility study for solarization of Mudrissa Mauza Assad Ullah Pur

[Completed]

Updated soon...

Read More




Feasibility study for Solar Water Tube wells for Chak no. 100,101,102 & 105.

[Completed]

Provided feasibility study for solar tube well installation at sites Chak # 100, 101, 102 and 105

Read More




Third Party Validation of the project Provision of solar panels to the households below the poverty line-Chief Ministers Ujaala Program

[Completed]

The Government of Punjab distributed about 288,046 solar home solution systems targeting the low income background people of the society in three phases. Solar lamps were distributed based on the merit of the Government institution…

Read More




Energy Audit of Different Departments of UET, Lahore Campus

[On-going]

Energy Audit of various Departments of UET, Lahore will be executed with the vision to solarize the main Campus.

Services will be provided as below:

Read More




House Hold Solarization Loan Project

[Completed]

The Government of Punjab planned to provide around 20,000 to 50,000 Small Home Solutions (SHS) to common people of Punjab Province. The system consisted of 4KWp PV panels, solar hybrid air conditioner, 10 LED tube…

Read More




Solarization of Punjab IT Labs

[Completed]

The Government of Punjab is in process of shifting the computer IT labs of entire colleges in Punjab province which is around 40,000. The system will consist of 7KWp – 10kWp PV panels, LED tube…

Read More




Chief Minsters Ujaala Program Phase I

[Completed]

The Government of Punjab decided to spread awareness regarding solar system among the people especially young students for promotion of solar technology in the province to reduce burden on national grid. In this scheme the…

Read More




Chief Ministers Ujaala Program Phase II

[Completed]

The Chief Minister’s Ujaala Program continued its Phase II and the Government of Punjab distributed about 60,000 same solar lamp systems having similar specifications among students of Government institutions.

Read More




50 Wp AC/DC Solar system for Tribal Area Development Project (TADP) DG Khan

[Completed]

TADP distributed small size solar AC/DC systems with 50Wp solar panel and 65Ah battery. Total quantity of systems is 8000 and size is around 400kWp.

Services provided are listed…

Read More




NAVTTC Solar and Renewable Energy Resources Courses

[Completed]

Al-Khawarizmi Institute of Computer Science has initiated training courses funded by NAVTTC. Two courses are being taught: One is based entirely on Solar Technology. Other course will be focused on all Renewable Resources. These courses…

Read More




Punjab Skills Development Fund (PSDF)- Solar Photovoltaic Installation and Pumping Training

[Completed]

Al-Khawarizmi Institute of Computer Science has conducted a Comprehensive Training Course on Solar Technology and PV pumping training in multiple in PSDF schemes. Training Project was funded by Punjab Skills Development Fund (PSDF). Course is…

Read More




Feasibility Study for 2.5MWp On-Grid Solar System at Islamia University, Bahawalpur

[Completed]

This project envisages installing 2.5 MW Solar Photovoltaic Power project in IUB to utilize abundantly available solar energy resources in the area. Land for project has been arranged by Islamia University Bahawalpur. The project will…

Read More




Feasibility Study for solarization of Evacuee Trust Property Board (ETPB) Building

[Completed]

ETPB intended to assess the critical load and installation of solar system. Therefore, a complete feasibility study including site inspection, load assessment, solar system sizing and financial analysis was required.

Read More




Feasibility Study for solarization of Rescue 1122 Buildings

[Completed]

The Government of Punjab is determined to solarize the 1122 buildings. Solarization of 50 sites has to be done with each a system of 3KW. To fulfill this aim, complete feasibility study and specifications design,…

Read More




Feasibility Study for solarization of Management and Professional Development Department (MPDD)

[Completed]

The Government of Punjab is in process of making feasibility study for shifting MPDD on solar system. Total load of entire building is 458kW and system would also be on-grid in order to provide energy…

Read More




Solarization of Schools in Rajanpur

[Completed]

The Government of Punjab is in process of shifting Fans and Lighting load of schools of the Punjab region on solar system. Around 200Wp solar panels, charge controllers, batteries, LED lights and fans will be…

Read More




Feasibility study for solarization of Basic Health Units

[Completed]

The Government of Punjab has planned to solarize the Basic health units (BHU) and three sites of BHU are selected for feasibility study. AERIL-KICS provided services for feasibility study.…

Read More




Feasibility study for Solarization of Lahore High Courts, Judicial Commission and Session Courts

[Completed]

The Government of Punjab required solarizing the High Court, Judicial Commission and Session Court. Solar system feasibility study, load assessment, design of system and installation were the main project features.

Read More




Southern Punjab Poverty Alleviation

[Completed]

The Government of the Punjab initiated this project to provide relief to the poor people of Southern Punjab from energy deprivation and provided 1050 solar systems each with 120 Wp specification.

Read More




Quaid e Azam Solar Park Project 100MW Solar System

[Completed]

The Government of Punjab has dedicated 6,500 acres of land near Lal Sohanra, Cholistan, Bahawalpur for the purpose of establishing a Solar Park for 1000 MW. 500 acres have been reserved to set up the…

Read More




Solarization of 50 offices in Punjab

[Completed]

The Government of the Punjab has decided to shift their offices, off-grid schools, basic health units etc. to solar power solution systems. In the first phase, 50 marked Government offices were shifted into solar power…

Read More




Short Consultancy Services regarding Performance Evaluation of 50 solar PV systems installed by Contractor for the project Solar PV system for Government Offices

[Completed]

Short Consultancy services are being provided by KICS for post installation performance evaluation of solar PV systems installed in the 50 District/ Divisional Government offices in Punjab Province.

Services…

Read More




Solarization of Quaid e Azam Library, Lahore

[Completed]

The administration of Quaid e Azam Library (QAL) required utilization of solar energy to power up their crucial load. Team performed on-site evaluation, layup marking and indemnification of crucial load. Post installation site evaluation was…

Read More




Consultancy services for solarization of Institute of Business Management (IBM-UET) 48kWp

[Completed]

It was indigenous project to utilize solar energy as back up for crucial load of IB&M and UET Lahore. Activities included site evaluation, layup marking and observation of crucial load, Post installation site…

Read More




Consultancy services for Solarization of Planning and Development Department (76.6KWp)

[Completed]

The Institute has provided consultancy services for solarizing the complete building of P&D Punjab Department after the retrofitting of conventional loads, suggested through complete energy audit.

Read More




Laboratory Testing and Evaluation of samples of LED lights for Metro Multan Project

[Completed]

The client required the supply, installation, testing, commissioning, operation and maintenance of LED Lights for the construction of Metro Bus system Multan. KICS provided services for the project and delivered testing and evaluation report of…

Read More




Energy Audit of Institute of Business Management (IBM-UET)

[Completed]

The administration of IB&M, UET Lahore wanted utilization of solar energy to power up their crucial load. Team performed Energy Analysis of the IBM building to see the potential savings of Energy before…

Read More




Energy Audit and installation of 35.1KW Hybrid Off-Grid Solar System for KICS building

[Completed]

Energy Audit of KICS building was performed following the installation of 35.1KW off-grid solar system installation. Approximately 80% lighting load of the building was cut off after Energy audit to conserve energy. Conventional light panels were replaced with LED light…

Read More




Energy Audit for Planning and Development Department

[Completed]

The Planning and Development intended to shift its building load on Solar System. Before solarization, detailed energy audit of the building was required to identify the retrofitting opportunities.

Services provided by our LAB:

  • Detailed Energy Audit of the building
  • Read More




Solar Tube Well Specifications

[Completed]

Services provided to ABAD by our LAB:

Feasibility study by site inspection

Design specifications for solar tube well

Read More




Feasibility study for solarization of Submersible Pumps in SCARP-VI

[Completed]

Solarization of 512 Submersible Pumps in SCARP-VI in Rahim Yar Khan

Services:

  • Technical assistance in formulation of design and specifications for prototype systems
  • Technical Evaluation and assessment of designed system

Read More